Pre-treatment & Dyeing process flow chart?


Pre-treatment flow chart of Dyeing

Most textile materials and fabrics require pre treatments before they can be dyed. We use NaOH to remove wax, oil, fats and natural impurities from fabric, this process is called scouring which increase fabric absorbency. We use H2O2 to increase the fabric whiteness, this process is called bleaching. Because fabrics which have been prepared for dyeing must have sufficient absorbency and whiteness.

Fresh water and fabric Load at 45OC
↓
Temperature raise to 60OC
↓
Detergent, Peroxide Stabilizer inject
↓
Run for 5 min
↓
Inject Caustic and run 5 min
↓
Raise temperature to 70OC
↓
H2O2 inject and run 5 min
↓
Temperature raise to 105OC
↓
Run for 30 min
↓
Lower the temperature to80OC
↓
Bath drain
↓
Peroxide killer inject and run 10 min
↓
Rinsing and unload the fabric.


Dyeing process flow chart:
Grey fabric receive from knitting section
↓
Batching
↓
Turning of fabric (only for Single Jersey)
↓
Selection machine no
↓
Fabric loading
↓
Select production program
↓
Select recipe for dyeing
↓
Pretreatment
↓
Dyeing
↓
After treatment
↓
Fabric Unload