What Is IE/Work Study Procedure?

What Is IE/Work Study Procedure?
Writing By,
Nurul Amin Jibon
IE Executive (Mohammadi Group)
B.Sc In Textile Engineer
Primeasia University. Batch: 091
Phone No : 01687-201045
Work-study is a systematic job procedure. There are many objects to be studied systematically to carry out the most economical result. The procedure will be continued step by step for view. Let’s see the below:-

Select: Select the task to be studied.

Record: Record or collect all relevant data about the task or process, using the most suitable data
collection techniques (Example, in ------), so the data will be in the most convenient form to be analyzed.

Examine: Examine the recorded facts critically (Details in -----), challenge everything that is done, considering in turn- *the purpose of the activity *the place where it is performed *the sequence in which it is done *the person who is doing it and *by which it is done.

Developing: Develop the most economic method and drawing as appropriate techniques on the
contribution of those concerned (managers, supervisors, workers and others specialist)

Evaluate: Evaluate different alternatives to developing a new improved method comparing the cost effectiveness of the selected new method with the current method of performance.

Training: To be trained up the people who will perform this developed task as a basic operator.

Install: Install the new method as an agreed practice with the allotted time of operation.

Maintain: Maintain and establish control procedure by monitoring the results & comparing them with the original targets.

Work Study Techniques

There are two primary systematic techniques used by work study practitioner-

Method Study: -------- the systematic recording and critical examination of activities in order to make improvements.

Work measurement: -----------the application of techniques designed to establish the time for a qualified worker to carry out a task to a specified method.

The techniques of work measurement

The following are the principal techniques by which work measurement carried out-

1.         Cycle check
2.         Production study
3.         Element Study
4.         Time Study
5.         Time Standard
6.         Work sampling

7.         GSD