Pre-treatment flow chart of Dyeing
Most
textile materials and fabrics require pre treatments before they can be dyed. We
use NaOH to remove wax, oil, fats and natural impurities from fabric, this
process is called scouring which increase fabric absorbency. We use H2O2 to
increase the fabric whiteness, this process is called bleaching. Because
fabrics which have been prepared for dyeing must have sufficient absorbency
and whiteness.
Fresh
water and fabric Load at 45OC
↓
Temperature
raise to 60OC
↓
Detergent,
Peroxide Stabilizer inject
↓
Run
for 5 min
↓
Inject
Caustic and run 5 min
↓
↓
H2O2
inject and run 5 min
↓
Temperature
raise to 105OC
↓
Run
for 30 min
↓
Lower
the temperature to80OC
↓
Bath
drain
↓
Peroxide
killer inject and run 10 min
↓
Rinsing
and unload the fabric.
Dyeing
process flow chart:
Grey
fabric receive from knitting section
↓
Batching
↓
Turning
of fabric (only for Single Jersey)
↓
Selection
machine no
↓
Fabric
loading
↓
Select
production program
↓
Select
recipe for dyeing
↓
Pretreatment
↓
Dyeing
↓
After
treatment
↓
Fabric
Unload