Product
development is another important responsibility for RMG merchandisers. Before
go to bulk production various stage of sampling has to pass in order to develop
a product for end user.
Sequence of Sampling
Counter sample/Style
sample/Salesmen sample
Fitting sample/ Size set
sample
Pre-Production.
Pre-Shipment Sample.
Shipping Sample.
Photo/ Advertisement/ Catalog Sample
Sequence of Sampling
Counter sample/Style sample/Salesmen sample
Fitting sample/ Size set sample
Pre-Production
Pre-Shipment Sample
Shipping Sample
Photo/
Advertisement/ Catalog Sample
Steps of Garment Sample Approval:
Step-1
Style sample (Closest available fabrics and trims)
Step-2
Step-3
Pre- production sample (In Actual)
Step-4
Pre-Shipment sample (In Actual)
Fabrics
Selection
Approval
Fabrics (for hand feel & Approval) Test done from official Testing House
1st Bulk Fabrics in each Color Test report in each color
Lap
dip
Each
Color ¾ Options for Dry Recipe Confirmation with "Spectro
Readings"Re- Sub Needed Until Approval.
Swatch
Swatch is a
presentation of all the materials is (Fabrics & Accessories) used for any
specific style/order. Usually small piece of fabrics and each piece of
accessories are attached in board paper in a systematical manner. Swatch is very
important for production line to make the correct construction of a garment and
QC departments ensure it. Concerned merchandiser should confirm/approve the
swatch.
Style sample
development The
main object to develop style sample is to approve the styling of a product that
a designer imagine first. This sample is usually made by available color but
actual design, construction and weight. But some time buyer ask sample to make
by actual color
Size set sample
development The
main object to develop size sample is to confirm the measurement, body fitting
etc. This sample is also made by available color but actual construction and
weight.
Pre-production
sample development The
main object to develop Pre production sample is to confirm the final product
from buyer. After receive pre-production sample we can start final/bulk
production.
No comments:
Post a Comment