Work-study
is a systematic job procedure. There are many objects to be studied
systematically to carry out the most economical result. The procedure will be
continued step by step for view. Let’s see the below:-
Select:
Select the task to be studied.
Record:
Record or collect all relevant data about the task or process, using the most
suitable data
collection techniques (Example, in ------), so the data will be in the most convenient form to be analyzed.
collection techniques (Example, in ------), so the data will be in the most convenient form to be analyzed.
Examine:
Examine the recorded facts critically (Details in -----), challenge everything
that is done, considering in turn- *the purpose of the activity *the place
where it is performed *the sequence in which it is done *the person who is
doing it and *by which it is done.
Developing:
Develop the most economic method and drawing as appropriate techniques on the
contribution of those concerned (managers, supervisors, workers and others
specialist)
Evaluate:
Evaluate different alternatives to developing a new improved method comparing
the cost effectiveness of the selected new method with the current method of
performance.
Training:
To be trained up the people who will perform this developed task as a basic
operator.
Install:
Install the new method as an agreed practice with the allotted time of
operation.
Maintain:
Maintain and establish control procedure by monitoring the results &
comparing them with the original targets.
Work Study Techniques
There
are two primary systematic techniques used by work study practitioner-
Method Study:
-------- the systematic recording and critical examination of activities in
order to make improvements.
Work measurement:
-----------the application of techniques designed to establish the time for a
qualified worker to carry out a task to a specified method.
The techniques of work measurement
The
following are the principal techniques by which work measurement carried out-
1. Cycle check
2. Production study
3. Element Study
4. Time Study
5. Time Standard
6. Work sampling
7. GSD